Friday, October 26, 2012

Week 8: The Carpet

Tuesday we met at the LOC and talked a bit about what we've got done for the Skate Jam and the Clean Up Day. Then we were told to think of two ideas for the outing club a realistic and crazy one. We brainstormed and though about two idea. Then each group presented our ideas.
Thursday we went to Jay Peak to help install a carpet along Stateside. We helped the crew by evening out the terrain and placing beams. Then each of the metal frames were put into place. We then broke for lunch. After lunch we adjusted all the beams and frames by leveling them and sighting to make sure everything was straight. After everything was squared away we put the bottom terminal into place then fed in the bottom part of the carpet.




No comments: